How many revision rounds to put in the contract
What counts as a revision versus new work, how many rounds are enough, and how to word it so nobody argues later.
In short
Two or three rounds per stage is the working norm. The number matters less than the definition: what counts as a revision at all. Without that, the argument starts at the first "let's try it another way".
Revision or new work
A revision is a change within the agreed scope: rewording, a larger type size, swapping two blocks, adjusting a colour.
New work is something that wasn't in the scope: an extra page, a different catalogue structure, another concept, an additional language.
The line isn't drawn by effort but by scope: a five-minute "add one more form" is new work, while half a day redrawing an agreed block is a revision.
How many rounds you actually need
| Stage | Rounds | Why |
|---|---|---|
| Prototype | 2–3 | changes are cheap here, discuss everything |
| Design | 2 | more usually means a fuzzy brief |
| Markup | 1–2 | this is polish, not rethinking |
Agreeing on timing
Revisions need deadlines on both sides: the vendor is accountable for fix speed, the client for feedback speed. A clause like "notes are provided within five working days" protects more than the vendor — without it the project hangs and your launch date moves too.
When the rounds run out
Have the honest conversation: what exactly doesn't work, and why. If the problem is the original brief, redefine and requote it. If it's the execution, that's warranty work, not a revision. The distinction matters: a vendor doesn't charge for fixing their own mistakes.
Let's agree the terms
Our contract draws the line by scope: changes within an agreed stage are in the price, while comments outside it become a separate task with its own estimate.
Service
Website development at Alba Creation — end to end, directly with the developers.
Starting at 150,000 ₽
Read next
Website Development Specification Template
Use this website development specification template to define pages, content, forms and integrations, agree the scope and write acceptance criteria.
4 min readWhy development takes longer than expected
Where the time actually goes, which delays are on the client's side, and how to tell an ordinary slip from a worrying one.
2 min readWhat a project manager actually does
The "management" line in a quote raises the most questions. What a PM does, and what happens to a project that doesn't have one.
2 min read