How project acceptance works
Without a clear acceptance procedure a project drags for months. How to sign off stages, what to check, and why silence is a decision too.
In short
Acceptance is the moment both sides record that a stage is finished. Without it the project becomes an endless stream of revisions where nobody can say what's paid for and what's still in progress.
Why projects stall without it
Until there's a point marked "accepted", every new thought lands on work already done. The design gets revised while the build is underway; the structure changes while the catalogue is being filled. The vendor redoes work, dates slip, and eventually the conversation turns to money — with nothing to point at.
What it looks like in practice
- The vendor sends the stage result and states what is being accepted.
- You have an agreed review window — typically 3–5 working days; in our contract it's 5 working days.
- You reply either "accepted" or one consolidated list of issues.
- The vendor fixes the issues that belong to this stage.
- The stage closes and is paid; further changes to it become separate work.
What to check at each stage
Prototype. Are all the needed pages there, and is the path to an enquiry clear?
Design. Mobile isn't "later", it's now. Check how long headlines and empty states look.
Build. Open it on your own phone. Submit the form. Check where the enquiry lands.
Launch. The site is on your domain, the certificate works, analytics is collecting, and you hold the credentials.
How to give feedback
One list, not ten messages across several days. Each point specific: not "it doesn't feel right" but "the headline wraps to four lines on my phone, it needs to be shorter." Mark anything outside the stage's scope honestly as a future wish — at least then it gets counted separately.
Want a process you can see into?
We'll walk you through how our stages and sign-offs work, so you always know where things stand.
Service
Website development at Alba Creation — end to end, directly with the developers.
Starting at 150,000 ₽
Read next
How to choose a web development contractor: 12 criteria
What to check before you sign: portfolio, contract, estimates, code ownership, and the early signals that a project is about to go sideways.
4 min readHow not to lose access to your site and domain
Companies usually lose a website not to hackers but because everything was registered to the vendor. The accounts that must be in your name.
2 min readNDAs in IT projects: when you actually need one
An NDA protects specific data, not an idea. When it's worth signing, what belongs in it, and the measures that protect you better.
2 min read