Rebuild or refresh: deciding an old site's fate
Which is cheaper? Five questions whose answers show whether to keep investing in the existing site or start over.
In short
Keep improving while changes stay cheaper than rebuilding and don't drag new problems behind them. Once every change requires working around a limitation, the cost of improvements starts exceeding the cost of a new site.
Five questions
1. Does the site produce enquiries now?
If yes, improving is nearly always better value: the site has accumulated positions and traffic that a new project would have to earn again.
2. Can the change you need be made without workarounds?
If the developer keeps saying "possible, but we'll have to bodge it", the technical foundation is spent.
3. What does it cost to maintain?
An outdated platform that can't be updated and needs a rare specialist costs more than a new site within about two years.
4. Do you have the sources and documentation?
Without access to the code, improvement becomes archaeology and can't be estimated. Sometimes rewriting is faster than deciphering someone's legacy.
5. Has the business changed?
If the site was built for a different model, different services and a different audience, you'll be rewriting all the content anyway. That's a new site, even if the old one technically survives.
The middle path
Often the best answer: keep the URLs and the content but rewrite the technical layer. You don't lose positions and traffic, and you get a site that can be developed. Cheaper than a full rebuild, and it solves most of the problems.
Before deciding
- List what you want to change over the coming year.
- Ask for an estimate of each item on the current site.
- Ask for an estimate of a new site with the same feature set.
- Add two years of support to both figures.
- Compare — and factor in the traffic risk of a full rebuild.
Not sure which is better value?
We'll review the current site and cost both routes honestly — including what support will run to.
Service
Website redesign at Alba Creation — end to end, directly with the developers.
Read next
Setting up work with a remote contractor
What replaces walking over to someone's desk: communication rhythm, checkpoints, tools and the rules that make remote work predictable.
2 min readHow to write tickets developers understand
A template for tickets that land first time: what to describe, what to leave out, and why "make it look nice" is the most expensive brief.
2 min readBug or change request: who pays for the fix
Is it a warranty bug or paid new work? How to tell them apart and contract wording that can reduce disputes after launch.
2 min read