Working with a contractor in sprints
Sprints aren't about methodology fashion — they're about seeing something working every two weeks. How it looks from the client's side.
In short
A sprint is a short block of work, usually one or two weeks, ending with something that runs. The point is frequent feedback: you catch a misunderstanding after two weeks rather than after three months.
How it works
At the start you and the vendor choose what goes into the next fortnight. A short, specific list.
During the sprint the scope doesn't change. New ideas go onto a shared list and enter the next sprint — this is the rule that matters, and without it sprints become ordinary chaos with a nicer name.
At the end you're shown something working, not a progress report. Your feedback feeds the next round of planning.
What the client gets
- A predictable rhythm: you know exactly when you'll see something.
- The ability to change priorities — between sprints, not mid-sprint.
- Early mistakes stay cheap.
- Transparency: the team's pace and the realism of the schedule become visible.
When sprints aren't needed
For a landing page or a standard site they add overhead for nothing: the scope is known and there are three stages. Sprints earn their place on long projects where requirements sharpen as you go — platforms, customer portals, products.
How this fits with a fixed price
Usually like this: a fixed price for planning and design, then sprints billed hourly with a monthly cap. You get a predictable start and flexibility where describing everything upfront was never possible.
Long project ahead?
We'll explain what sprint work looks like in practice and how much of your time it needs.
Service
Website development at Alba Creation — end to end, directly with the developers.
Starting at 150,000 ₽
Read next
Website Development Specification Template
Use this website development specification template to define pages, content, forms and integrations, agree the scope and write acceptance criteria.
4 min readWhy development takes longer than expected
Where the time actually goes, which delays are on the client's side, and how to tell an ordinary slip from a worrying one.
2 min readWhat a project manager actually does
The "management" line in a quote raises the most questions. What a PM does, and what happens to a project that doesn't have one.
2 min read